top of page
photo-1578356058390-f58c575337a2.jpeg

PRINCÍPIOS DE ENGENHARIA DE PERFURAÇÃO

Well lifecycles have three primary areas of focus or stages; design and construction, well operation and intervention, and abandonment.

ISO 16530 delineates the lifecycles stages into six lifecycle phases, Basis of design, design, construction, operational, intervention, and abandonment.

The ability to sustain well integrity is fundamentally dependent on both the design and the operational stages. Before construction, an appropriate well design including a well barrier envelope evaluation will facilitate long term well integrity sustainability. Additionally, a suitable well integrity management system (WIMS) should assure well integrity is maintained throughout the entire well lifecycle.

O curso pode ser dado

Online ou, em sala de aula nas instalações do Cliente ou no Algarve Portugal

DURATION: 5 days

LEVEL: Foundation to Skill

DESIGNED FOR YOU, IF YOU ARE...

Drilling and Completion Engineers and Technicians; Superintendents, Wellsite Supervisors, and Inspectors.
Any person, who designs, plans or manages well drilling, wellbore completion and field operations activities
will benefit from this course.

Mechanical / Chemical / Production/ Petroleum Engineering Graduates or Students

Working executives / Professionals looking for a change in career or students who have mechanical, electrical, electronic or instrumentation background.

Corporate companies for enhancing staff performance and ability.

 

HOW WE BUILD YOUR CONFIDENCE

We will use slides presentation, paper exercises and examples from real cases.

Group discussion and experience exchange.

 

THE BENEFITS FROM ATTENDING

The organization will gain, in sending their employees to attend this training course, the following:
  • Reduction in the cost of the well by proper the approved procedures for each stage of the well life cycle.

  • Extending the well life and control it, achieve the optimum production using the most suitable procedures to be applied.

  • Ensuring the well integrity and avoiding all risks during the well operation.

 

By the end of the course, you will feel confident in your understanding:

  • The different stages of the well life cycle.

  • The procedures to be applied in each stage.

  • Know the well process and how the oil and gas are produced to separated.

  • Familiarization with well control methods during all well stages.

  • Increase the knowledge regarding the completion design.

  • Plug and abandonment procedures and application.

DAILY AGENDA

Day 1

Introduction to well lifecycle

Well design

  • Well construction sequencing

  • Select well site

  • Drill well bore hole

  • Preliminary well testing

  • Propose final well design

Day 2

Well construction (drilling & completion)

  • Construct permanent well

  • Develop and disinfect well

  • Test well performance

  • Submit well completion report

  • Run completion

Day 3

Production

Module 1 Upstream Overview and Exploration technics

  • General overview about upstream

  • Oil and gas production techniques

  • Varying well completion and treatment techniques used

  • Understanding the properties of oil

  • Well testing and recovery methods

Module 2 Plant Operations, Well Safety and SOP (Standard Operating Procedures)

  • General awareness regarding the plant operation

  • Understanding the well safety

  • Various fluid control equipment

  • Production and understanding the well kick-off operation

  • Following Safe Operating Procedures (SOP)

Module 3 Flow Measurement and Crude Oil Purification

  • Oil and gas separation and maintenance

  • Flow measurement equipment

  • Flow measurement equipment safety

  • Purification of crude oil

  • Crude Oil Storage

Module 4 Types of Pumps and Valves, Processing methods and Calculations

  • Basic calculations and PID control system

  • Function of valve types

  • Function of pump type

  • Gas processing methods

  • Gas purification methods

Day 4

Maintenance stage (workover)

  • Types of Completions

  • Reasons for Work-overs and well preparation

  • Overview of Surface and Subsurface Well-bore Equipment and Procedures

  • Barriers, Completion and Work-over Fluids

  • Kick Causes, Warning Signs, kill methods and Risk awareness and Organizing a Well Control Operation

Day 5

Plug and abandonment stage

  • The Objectives of Well abandonment

  • Common Abandonment methods

  • Typical Abandonment risks

  • Rig and Services requirements

  • Rigless alternatives

  • Case study

  • Discussion

  • Exam and assessment

bottom of page